Jump to navigation
Standard Asset ID Plaque and Bench Mark Tablet - PDF (pdf/350.37 KB)
Standard Culvert Asset ID Tag - PDF (pdf/245.85 KB)
Assurance of professional design & commitment for field review (pdf/769.83 KB)
Schedule A - Summary of Design and Field Review Assignments (pdf/182.24 KB)
Assurance of professional design - Post construction (pdf/777.1 KB)
Assurance of Field Reviews and Compliance (pdf/752.41 KB)
Standard Specifications for Bridge Construction (pdf/3.17 MB)
Division 4 - Drainage Structures (pdf/310.37 KB)
Division 5 - Granular Materials (pdf/467.12 KB)
Division 6 - Bituminous Materials (pdf/800.22 KB)
Division 7 - Incidental Construction (pdf/300.46 KB)
Division 8 - Miscellaneous Construction (pdf/355.37 KB)
Transportation Strategy Report Card - 2016-2019 (pdf/1.87 MB)
Mackenzie Valley Highway Project - Public Presentation - Update - Norman Wells, Tulita - Aug 2021 (pdf/3.57 MB)
Tłı̨chǫ Highway Corridor Working Group - Minutes (June 16, 2021) (pdf/301.21 KB)
Mackenzie Valley Highway - Climate Lens Part1 - GHG Mitigation Assessment (pdf/816.62 KB)
Mackenzie Valley Highway - Climate Lens Part2 - Climate Change Resilience Assessment (pdf/2.02 MB)
Tłı̨chǫ Highway: May 2021 Update (pdf/531.41 KB)
Division 3 - Grading (pdf/496.19 KB)