Electrical and Elevators

Electrical Systems

Inspections

In communities where an Electrical Inspector is available, up to three inspections may be performed for the cost of the permit fee, including:

  1. Permission to Make Roughed in Electrical Work Inaccessible
  2. Authorization for Power Connection
  3. Final Inspection

In communities where a physical inspection cannot be done within 14 days of notification—and the installation was done by a Qualified Electrical Worker—the first two inspections may be approved if the Qualified Electrical Worker forwards a completed Statutory Declaration by fax, followed by a phone call to the Regional Electrical Inspector.