Updated September 14, 2021
Grader finishing the roadway surface
Completed section of road with ditch
Sunset on freshly placed gravel
Embankment on a geogrid reinforced section of road
Road excavation at KM 34
A section nearing completion.
Embankment construction underway near Whatì.
Ditch escavation underway.
A herd of bison passing by at kilometre 24.
La Martre bridge: the largest and longest bridge on the new road.
A rock crusher and front-end loader.
The "boot room".
Caitlyn Fraser, packer operator, Yellowknife
Leon Lafferty, truck driver, Behchokǫ̀