Jump to navigation
S-007-24_TL-2 Thrie Beam Bridgerail with Strong Post W-Beam (pdf/486.19 KB)
S-109-24_Type SL-510 Prestressed Concrete Bridges with Steel Substructures - Sheet2 (pdf/414.98 KB)
S-001-24_Standard Asset ID Plaque and Bench Mark Tablet (pdf/392.55 KB)
S-004-24_TL-4 Double Tube Type Bridgerail Details (pdf/542.34 KB)
T-002-24_Typical Detail Drawing Expansion Bearing (pdf/389.54 KB)
T-001-24_Typical Details Drawing Installation of CMP and SPCMP Structures (pdf/3.69 MB)
T-004-24_Typical Detail Drawing Steel Plate Girder Bridges Sheet2 (pdf/375.59 KB)
Bridge Structures Design Guidelines (pdf/1.32 MB)
S-002-24_Standard Culvert Asset ID Tag (pdf/335.64 KB)
Bridge Drafting Guidelines (pdf/690.2 KB)
Commercial Drivers Winter Road Safety (pdf/274.32 KB)
S-107-24_Prestressed Concrete Type SL-510 Girder Standard Details (pdf/376.13 KB)
2023-2024 Energy Initiatives Report (pdf/3.13 MB)
S-106-24_Prestressed Concrete 14 m Type SL-510 Interior and Exterior Girder Layouts (pdf/392 KB)
T-003-24_Typical Detail Drawing Steel Plate Girder Bridges Sheet1 (pdf/335.24 KB)
2023-24 Registrar of Motor Vehicles Report (pdf/1.37 MB)
2023 NWT Traffic Collision Facts (pdf/2.73 MB)
Hay River Harbour Restoration - Figure 1-1 Dredging and Project Area / Zone du projet et de dragage (pdf/4.76 MB)